Loading…
Loading…
Central Coast, NSW • 2024
Reduced detention volume by 22% via roof-water reuse and optimised pipe grading; approved on first submission.
We optimised the roof-water reuse strategy and pipe grading to reduce detention volume while maintaining compliance with ARR2019 and council DCP requirements.
Our deliverables included concept and detailed drawings, modelling notes, and a concise calculation package aligned to council templates.
22% detention reduction without extra footprint
ARR2019 compliant modelling
Approval on first council submission